Forum Replies Created

Viewing 1 of 1 posts
  • GGL

    Member
    January 22, 2021 at 3:26 am

    Te correct answer is “Warm Standby” as: Warm standby (RPO in seconds, RTO in minutes): Maintain a scaled-down but fully functional version of your workload always running in the DR Region. Business-critical systems are fully duplicated and are always on, but with a scaled down fleet. When the time comes for recovery, the system is scaled up quickly to handle the production load. The more scaled-up the Warm Standby is, the lower RTO and control plane reliance will be. When scaled up to full scale this is known as a Hot Standby. As desbribed in https://docs.aws.amazon.com/wellarchitected/latest/reliability-pillar/plan-for-disaster-recovery-dr.html

Viewing 1 of 1 posts